Home › Pricing

Pricing

Published rates, fixed fees, and a plain explanation of what moves a price up or down. No "contact us for a quote" runaround.

Get your fixed fee
Rate card

What it costs

Every job is quoted as one fixed fee before work starts. That fee does not change unless you change the scope — no hourly creep, no variations to the variation.

ServiceScopeFee (ex GST)
Trade breakdownNew builds and renovations to about $1.5m. Quantities grouped by trade in construction sequence — the format builders actually price from.$900 – $1,500
Full Bill of QuantitiesResidential and light commercial to about $5m. Measured to the Australian standard method, ready for tender or contract.$1,800 – $3,500
Pre-tender packagePriced estimate plus construction methodology and an indicative program — the full picture for a serious tender.$3,000 – $6,000
Variations & cost-to-completeAd-hoc reviews, variation assessments and cost-to-complete checks for existing clients.$150/hr or fixed

All fees exclude GST. Invoiced on delivery, payable within 7 days.

What pushes a fee to the top of the range

Two projects of the same construction value can differ by a thousand dollars in measurement effort. These are the things that actually drive it:

What doesn't change the price

How payment works

You get a written fixed-fee quote with a scope statement and a delivery date. Accept it by email and work begins. The invoice issues on delivery with 7-day terms. For a first job with a new client, that is the whole arrangement — no deposit, no retainer, no lock-in.

Pricing questions

How much does a Bill of Quantities cost?

A full BOQ for residential or light commercial work runs from $1,800 ex GST. A trade breakdown starts at $900 ex GST. Every job is quoted as a fixed fee before any work begins, so the number you accept is the number you pay.

Are you cheaper than hiring an estimator?

A full-time estimator in Australia costs well over $120,000 a year once on-costs are included, before software. Structmate is engaged job by job, so you carry the cost only on tenders you actually price.

How quickly can I get a Bill of Quantities?

Standard turnaround is five business days from the point you accept the fee. Drawings that arrive Monday are typically back with you by Friday. If your tender closes sooner, say so when you enquire — shorter turnarounds are sometimes possible and are quoted separately.

What format do I get the BOQ in?

Excel and PDF. The Excel version is structured so you can drop your own rates in, send trade sections to subcontractors, and roll totals up without rebuilding anything.

Want the actual number for your job?

Send your drawings and you'll have a fixed fee and a delivery date within one business day. There's no obligation and no follow-up sequence if you decide against it.

Request a fixed quote