A checklist of the drawings, schedules and documents needed to measure a project accurately, and what happens when pieces are missing.
The most common reason a quantity surveyor's fee comes in higher than expected, or accuracy comes in lower, is incomplete documentation. Here is what actually gets used, ranked by how much difference it makes.
Floor plans, elevations, sections and a site plan, at readable scale with dimensions. This is the backbone of the measurement. PDFs are fine; scaled and searchable PDFs are better; native CAD is best but rarely necessary for residential work.
Make sure the set is complete and consistent. A set missing sheet 4 of 9 will generate a query before anything else happens.
This one sounds administrative and is genuinely important. Measuring Revision C while you tender Revision E is a costly and entirely avoidable mistake. Send the register, and tell us which revision is current.
Footings, slabs, beams, columns, and reinforcement schedules. Without these, concrete volumes and reinforcement tonnages are estimated from typical construction for the type and location — usually within range, but an assumption rather than a measurement, and it will be marked as such.
What things are made of and to what standard. Two walls of identical area can differ substantially in cost depending on what is specified.
Which finish goes where, room by room. Without it, finishes are measured as a single assumed type across each area, which is fine for a rough figure and not fine for a tender.
Sizes, types, glazing and hardware. These can be measured off elevations if necessary, but the schedule is faster and more reliable — and glazing is expensive enough that guessing is not sensible.
Nothing dramatic, and the job does not stop. Missing information is handled in one of three ways, and a good bill tells you which applies to each item:
What should never happen is a silent guess dressed up as a measurement. If a bill does not tell you where its assumptions are, that is a warning sign about the bill, not a sign the project was well documented.
Before sending drawings for a quote, check you have: the full architectural set at current revision, the drawing register, structural drawings if issued, the specification, finishes and window schedules if they exist, and a note of what you are pricing for and when it is due. If half of that is missing, send it anyway — you will get an honest read on what the gaps mean rather than a request to come back when you are better organised.